Product Description
Product Name: 8 12 24 fibers MPO female to female multi mode trunk cable patch cord
MPO/MTP to MPO/MTP Patch Cable.It is a product designed for data center cable infrastructure, especially designed for 40G/100G network like 40G BASE-SR4 OR 100G BASE-SR10. This cable assembly with can be designed with 24 fiber cores in the MPO/MTP connectors on both side, or one end with 24 fibers in one end, in another end with 24 LC connectors.
Feature:
100% tested, high quality and reliability
Low insertion loss
Support OM3, OM4, SM optic fiber
Special specification available upon custom request
Utilize MPO/MTP Connectors
Rapid Deployment
Factory terminated
High density cable
Optimized performance
Compliant to directive 2002/95/EC (ROHS) and REACH SVHC
MPO connector complies with IEC-61754-7& EIA/TIA-604 -5
Application:
Data Center Infrastructure
Optical system access network
Storage Area Network- Fiber Channel
40G and 100Gbps Fiber Network
High density architectures
Product Specifications
Connector A |
MPO Female (pinless) |
Connector B |
MPO Female (pinless) |
Fiber Mode |
OM3 50/125μm |
Wavelength |
850/1300nm |
Polish Type |
UPC to UPC |
Minimum Bend Radius |
30mm |
Insertion Loss |
0.35dB Max(0.15dB Typ.) |
Return Loss |
≥20dB |
Attenuation at 850nm |
≤2.3dB/km |
Attenuation at 1300nm |
≤0.6dB/km |
Jacket OD |
3.0mm |
Cable Jacket |
LSZH |
Installation Tensile Load |
100 N |
Long-Term Tensile Load |
50 N |
Storage Temperature |
-40°C to +85°C |
Operating Temperature |
-10°C to +70°C |
Why choose Takfly ?
Service
1.Customer's logo: Acceptable
2.General inspection on fixing before packing
3.Third party inspection: Acceptable
Quality Control
All products must go through five inspections during bulk production.
1.Material incoming inspection before production
2.Full inspection after finishing each individual process
3.Full inspection after production half-done
4.Full inspection before packing
5.Spots inspection after packing before shipping
Advantage
1.15 years experience in manufacturing fiber optic products..
2.Availability of R & D with more than 10 engineers.
3.Design and molding with special molding house.
4.High quality, attractive price and fast delivery(2-7days); delivery of larger orders depends on final quantity;
5.OEM, ODM customer designs are also welcome
6.More than 200 workers
7.Excellent service
Delivery
1.Packing: 1 set/polybag, several sets/export carton, Neutral packing or as your requirement.
2.Sample time: 1-3 days after confirmation
3.Order lead time: generally 2-7working days; actual leadtime depends on final quantity and products.
4.Shipping port: Shenzhen China or HongKong
5.Shipping term: EXW or FOB
Shipping
1.Once confirmed the order, and payment settled before shipment.
2.Goods will be sent within 7 days with the fast, reasonable and efficient shipping mode such as DHL, EMS, UPS,FEDEX, TNT, etc.
3.Please make sure your consignee address is correct, so as to avoid missing of parcels.