24 cores MPO SM MM Cassette
Takly MPO/MTP module Cassettes is mainly used to divide the 12 or 24 fibers MPO/MTP connector of the pre-assembled terminal end to the simplex or duplex standard connector. By using the simplex or duplex patchcord, the output of the module can be directly connected with the equipments, frame or the client's end.
Features:
Adopts high quality engineering plastics and Aluminum alloy material.
MPO faceplate can be upgraded easily.
All the front port are with mark number, easy to identify.
Quick and easy installed, flexible in configuration and easy to management.
Applications:
Machine rooms of data center and internet;
Data communication network;
Optical system access network;
Storage area networking fiber channel;
High density architectures.
Specifications:
Fiber Type |
Single Mode |
Multi-mode |
Standard Insertion Loss |
Typical(dB) |
≤0.7 |
≤0.5 |
Low Insertion Loss |
Typical(dB) |
≤0.35 |
≤0.35 |
Return Loss (dB) |
≥60(APC) |
≥30(PC) |
≥50(PC) |
Tensile Strength (kgf) |
10 |
Durability(dB) |
≤0.2 500 matings |
Working Temperature(ºC) |
-40 ~+85 |
Testing Wavelength (nm) |
1310/1550 |
850 |
Why choose Takfly?
Service
1.Customer's logo: Acceptable
2.General inspection on fixing before packing
3.Third party inspection: Acceptable
Quality Control
All products must go through five checks before manufacturing process
1.Material incoming inspection before production
2.Full check after every individual process finished
3.Full check after production half-done
4.Full check before packing
5.Spots check after production packed before shipping
Advantages
1.15 years experience in manufacturing fiber optic products..
2.Availability of R & D with more than 10 engineers.
3.Available of design and making mold with special molding house.
4.High quality, attractive price and fast delivery(2-7days)
5.OEM, ODM customer designs are also welcomed
6.More than 200 workers
7.Excellent survice
Delivery
1.Packing: Plastic bag& carton, Neutral packing or as your required.
2.Sample time: 1-3 days after confirm
3.Order lead time: 2-7working days depend on quantity and products.
4.Shipping port: Shenzhen China or HK
5.Shipping term: EXW or FOB
Shipping
1.Once confirmed the order, and payment sent after finishing goods. 2.Goods will be sent within 7 days with the fast,reasonable and efficient shipping mode such as DHL, EMS, UPS,FEDEX, TNT, etc.
3.Please make sure your postal address is correct. Any lost and mistakes because of wrong address are not supplier's responsibility.
4.Please do not bid if you disagree with the shipping and handling charge.
Contact
1.Our working time:8:30am~5:30pm
2.All the inquiries will be replied within 24hours, So please feel free to send us your inquiry.
3.When our trade manager is offline, please feel free to leave a message, and your request, our professional sales person will reply to you within 24hours.
Company Overview:

Our Exhibitions: