Product Description
Product Name: MPO/MTP to SC/LC Fanout breakout cable for Fiber Optic patchcord
12 fibers MPO/MTP hydra cable assemblies is with one single 12 fibers MPO/MTP connector end and LC connector for other end. This patchcord needs to be installed inside of the module cassette, connecting the backbone cable with the equipment, which can be modularized and plug play. Compared with traditional splicing, it's dramatically improve the work efficiency and brings convenience.
Features:
100% tested, high quality and reliability
Low insertion loss
Special specification available upon custom request
Utilize MPO/MTP Connectors
Rapid Deployment
Factory terminated
High density cable
Optimized performance
MPO connector complies with IEC-61754-7& EIA/TIA-604 -5
Application:
Data Center Infrastructure
Optical system access network
Storage Area Network- Fiber Channel
40G and 100Gbps Fiber Network
High density architectures
Performance of Assemblies: MPO/MTP Termination:
Fiber Type | Singlemode | Multimode |
Fiber Count | 8,12,24,Core |
Standard Insertion Loss(dB) | ≤0.7 | ≤0.5 |
Low Insertion Loss(dB) | ≤0.35 | ≤0.35 |
Return Loss(dB) | ≥60(APC) | ≥30(PC) |
≥50(PC) |
Tensile Strength(kgf) | 10 |
Durability(dB) | ≤0.2 500mating |
Working Temperature(ºC) | -40~+85 |
Testing Wavelength(nm) | 1310~1550 | 850 |
Why choose Takfly ?
Service
1.Customer's logo: Acceptable
2.General inspection on fixing before packing
3.Third party inspection: Acceptable
Quality Control
All products must go through five inspections during bulk production.
1.Material incoming inspection before production
2.Full inspection after finishing each individual process
3.Full inspection after production half-done
4.Full inspection before packing
5.Spots inspection after packing before shipping
Advantage
1.15 years experience in manufacturing fiber optic products..
2.Availability of R & D with more than 10 engineers.
3.Design and molding with special molding house.
4.High quality, attractive price and fast delivery(2-7days); delivery of larger orders depends on final quantity;
5.OEM, ODM customer designs are also welcome
6.More than 200 workers
7.Excellent service
Delivery
1.Packing: 1 set/polybag, several sets/export carton, Neutral packing or as your requirement.
2.Sample time: 1-3 days after confirmation
3.Order lead time: generally 2-7working days; actual leadtime depends on final quantity and products.
4.Shipping port: Shenzhen China or HongKong
5.Shipping term: EXW or FOB
Shipping
1.Once confirmed the order, and payment settled before shipment.
2.Goods will be sent within 7 days with the fast, reasonable and efficient shipping mode such as DHL, EMS, UPS,FEDEX, TNT, etc.
3.Please make sure your consignee address is correct, so as to avoid missing of parcels.