Fiber Optic Video Ethernert Network 100Mbps 4 Port POE Switch with Vlan 250M
DF- 155M-4P-E is specialized unmanaged POE switch designed for video surveillance and network project system, etc. It provides 4 x 100Mbps Ethernet ports and 1x 100Mbps uplink ports, support VLAN function, can effectively prevent whole system from broadcast storm so that make the data transfer safer.
This POE network switch can meet customer's general demands. POE network switch with POE function, designed for high-definition network camera's internet access. It provides 4 100Mbps PoE Ethernet switches, complies with IEEE802.3af/at standards, and also simplifies wiring, avoids the troublesome of installing power socket for powered devices.
Typical applications please refer to following picture
Features
1. Provide 4 x 100Mbps Ethernet ports, 1 x 100Mbps up-link ports
2. Support End-Span method complies with IEEE802.3 af/at standards, can supply max 30W power which is possible to power high-power infrared cameras.
3. Comply with IEEE802.3, IEEE802.3u, IEEE802.3af/at standards. Support IEEE802.3x full-duplex flow control, support Auto MDI/MDIX
4. Support port-base Vlan, prevent from broadcast storm so that make data conversion more efficient and safe.
5. Various LED display functions can real-timely display the device's current working conditions, and help prompt facility and remove trouble easily.
6. Excellent lightning protection, lightning capacity up to 2KV
7. Easy to install and operate on walls or on the desktops
Technical Specification
Item |
Description |
Model |
DF- 155M-4P-E |
Power Supply |
Power Supply Mode |
Power Adaptor |
Voltage Range |
DC48~56V |
Power Consumption |
The device <5W
POE power supply <60W |
Network Port Parameter |
Network Ports |
1~4 Ethernet Port:10/100Mbps
1 Uplink Port:10/100Mbps |
Transmission Distance |
1~4 Ethernet Port:100m
Mandatory 10 Mbps reach up to 250m
Uplink port:100m |
Transmission Media |
1~4 Ethernet Port:Cat5e/6 standard UTP cable, Uplink Port:Cat5e/6 standard UTP cable |
POE Agreement |
IEEE802.3 af/at standards |
PoE Power Supply Mode |
End-span method |
PoE Power Supply Wattage |
Each port ≤30W,Whole device<60W |
Network Switch Specification |
Network Standard |
IEEE802.3 10BASE-T,IEEE802.3u 100BASE-TX/FX,IEEE802.3az(Uplink optical fiber port ) |
Swap Mode |
Store-and- forward |
Data-Caching Mechanism |
448K |
MAC Address List |
1K |
Status Indicators |
Power Indicator Light |
One power light (Green) |
Optical Fiber Port Indicator |
One fiber link indication light ( green), Green light keeps on when the fiber port is well connected; Blinking when transceiver data |
PoE Indicator |
4 PoE indicator light(yellow) |
PoE Network Port LED |
1~4 port ( green light on RJ45 jack) Blinking when transceiver data |
Switch |
Vlan Switch |
One, slide switch to "ON" + press restart button, Vlan function opens |
Protection Level |
Surge Immunity |
Level 3, executive standard:IEC61000-4-5 |
Electrostatic Protection |
1a touch electric discharge: level 3
1a Air discharge: level 3
Executive standard:IEC61000-4-2 |
Operating Environment |
Working Temperature |
0ºC~55ºC |
Storage Temperature |
-40ºC~70ºC |
Humidity(non-congeal) |
0~95% |
Mechanical Attributes |
Dimensions (L*W*H) |
128mmx77.75mmx27.35mm |
Color |
Black |
Weight |
425g |
Reliability |
Mean time between failures (MTBF) |
>50000h |
Note:
If any changes with product specification, forgive without prior notice.
As transmission distance has certain relation with the cable, so you are suggested to use standard cat5e/6 cable for longest distance needed.
Vlan
When V-lan function is opened, the LAN port can't make data conversion but can only communicate via uplink port. The V-LAN workstation is built separately between every network port and UP-LINK port.
In the same V-lan workstation, no matter which actual PoE switch being connected, the signal transmission are separately isolated from each other which seems they are on the different switches. The broadcast in the same V-lan can only be received by the members but can't be transmitted into other V-lan, which can greatly control unnecessary broadcast storm. What's more, different V-lan can't even communicate with each other when there is no routing, which increases the safe degree among different department in the enterprise.
5.2 Configuration
Toggle the V-lan button on the back of the switch to ON state, V-lan indicator lights, then press the reset button to restart the switch, in this way V-lan functions.
Note:
Please press reset button or repower the device when turn on V-lan, only in this way the switch can enter corresponding mode.
Installation
Packing List
Before installation, please check the following equipment and accessories, if there are any missing, please contact with your supplier.
1) 1 set of DF- 155M-4P-E
2) 1 power adapter
3) 1 user manual
4) 1 warranty card
Please install as below steps
Before installation, please turn off the power of all signal sources and the monitor in case of the damage to transmission device
Using network cables to connect with Ethernet ports of IP cameras and POE ports of PSE-2 series unmanaged POE switch
It using UP-LINK port to connect NVR or computer devices.
Check weather installation is correct and the device undamaged. Before power on PSE-2 series unmanaged POE switch, make sure that all connections are reliable
Confirm all network devices are powered and can work normally.
Troubleshooting
When the device encountered with troubles, it can be solved by the methods below:
1) Make sure the device is installed correctly referring to the requirements;
2) Make sure RJ45 cable is good contacted without open circuit; the cable design complies with EIA/TIA568A or 568B international standards.
3) Each PoE port can provides max 30W to switch and the total power is less than the maximum power provided by the device. So please don't connect with the PoE device which is more than 30W.
4) Press reset button to check if the device can work properly.
5) Replace the trouble device with a normal working device to check if the device is damaged.
6) If all the above methods still don't work, please contact with manufacturer directly.
Marking Method of RJ45 Connector
Required tools: wire crimpers, network cable tester.
The wire sequence of RJ45l connector must complies with international standard of EIA/TIA 568A or EIA/TIA 568B.
Strip about 2cm's of insulating jacket to let 4 pairs UTP can be seen.
Separate 4 pairs UTP cable, and try to straighten each pair.
Arrange 8 cables with correct line sequence of EIA/TIA 568A or EIA/TIA 568B.
Cut thread residue and leave 1.5cm wire which exposed outside the insulating layer, and ensure 8 wires are straight and neat.
Put 8 wires in RJ 45 connector, then press with wire crimpers.
Repeat above five steps , make the other side of UTP cable; Then using the cable tester to test whether the cat5e/6 works normally.
Why choose TAKFLY--- Advantages as follows:
Professional manufacturer:
1. More than 18 years manufacturing experience in Fiber optic products-one stop purcharsing.
2. More than 250 assembly workers with 3 years experienced;
3. More than 10 R&D Engineers;
4. 16 Sets Germany imported Injection Machine and 16 Production Lines;
5. More than 30 sets of Testing Machines: OTDR,3D,VFL,IL&RL test instrument; tension strenth tester, Crush Resistance tester, Power meter tester, light checker, ect.
6. OEM Brand is acceptable.
7. Exhibition: OFC, ECOC, CommunicAsia, NETCOM, AFRICACOM, SVIAZ ICT, CommunicIndonesia ,Global Soure Electronic Exhibition,etc.
Quality Control:
1. Spot check the raw material incoming inspection before production;
2. Fully check after every individual process finished;
3. Fully check production half done;
4. Fully check the finished products before packing;
5. Spot check before shipping;
Delivery:
1. Samples: 1-3 working days.
2. Mass Production Order: 3-7 working days.
3. Packaging: Plastic Bag, Carton and Pallet are available according to your request.
Shipping:
1. DHL,UPS,FEDEX,TNT,EMS, usually is 3-5 working days. Would keep tracking shipping status and reporting to clients;
2. By Sea or By Air, could use your own pointed forwarder or our cooperated one.
Payment Term: T/T,Paypal, Western Union and L/C are available.
Price: If your QTY is big, the price could be negotiated.
I have been working in this field more than 5 years, I believe, I could give you very good service and professional answers!
If you're interested in our products or have any doubt, why not send me inquiry at once?