Product Description
FTTH MPO OS2 Fiber Optic Patchcord Single Mode LSZH
ApplicationsAsynchronous Transmission Mode(ATM)Gigabit EthernetActive Deviced/Transceiver InterfaceCATV, Video and MultimediaPremise InstallationsTelecommunication NetworksParallel optical interconnect between PC Cards and patch panelsInterconnection for O/E modulesIndustrial & MilitaryOptical Switch interframe connections
Features:Precision molded MT ferruleHigh precision guide pins for exact alignmentCompact design, up to 4,8,12,24 fibersIEC 61754-7 CompliantEIA/TIA-604-5 Compliant
Specifications :
Item |
LC,SC,ST,FC....... |
MPO |
End face type |
PC,UPC and APC |
PC and APC |
Fiber type |
SM(G652,G655,G657);MM(OM1-OM5) |
Core number |
12,24 |
Cable Diameter |
0.9,2.0,3.0 |
Mini Round cable:Max4.5mm;
Ribbon cable:Max3.0*5.0mm |
Insertion loss(dB) |
≤ 0.3 |
Standard:≤0.35/0.75(Typical/Max)
Low Loss:≤0.2/0.35(Typical/Max) |
Return loss(Min) |
UPC SM:50dB
APC SM:60 dB
PC MM:35 dB |
SM:
APC:60
PC:50 |
MM:
APC:30
PC:25 |
Test Wavelength(nm) |
SM:1310/1550
MM:850/1300 |
Repeatability |
≤ 0.1dB |
Durability |
≤ 0.2dB |
Interchangeability |
≤ 0.2dB |
Operating Temperature |
-20ºC~70ºC |
Storage Temperature |
-40ºC~80ºC |
Outer Sheath Material |
PVC,LSZH,PU |
Bending radius(Static/Dynamic) |
10D/20D |
Length |
Customized |
Why choose Takfly ?
Service:
1.Customer's logo: Acceptable
2.General inspection on fixing before packing
3.Third party inspection: Acceptable
Quality Control:
All products must go through five checks before manufacturing process
1.Material incoming inspection before production
2.Full check after every individual process finished
3.Full check after production half-done
4.Full check before packing
5.Spots check after production packed before shipping
Advantage:
1.15 years experience in manufacturing fiber optic products..
2.Availability of R & D with more than 10 engineers.
3.Available of design and making mold with special molding house.
4.High quality, attractive price and fast delivery(2-7days)
5.OEM, ODM customer designs are also welcomed
6.More than 200 worker
7.Excellent service
Delivery:
1.Packing: Plastic bag& carton, Neutral packing or as your required.
2.Sample time: 1-3 days after confirmation.
3.Order lead time: 2-7working days depend on quantity and products.
4.Shipping port: Shenzhen, HK or other ports as you required.
5.Shipping term: EXW or FOB
Shipping:
1.Once confirmed the order, and payment sent after finishing goods.
2.Goods will be sent within 7 days with the fast, reasonable and efficient shipping mode such as DHL, EMS, UPS,FEDEX, TNT, etc.
3.Please make sure your postal address is correct. Any lost and mistakes because of wrong address.
Contact:
1.Our working time:8:30am~5:30pm
2.All the inquiries will be replied within 24hours, So please feel free to send us your inquiry.
3.When our trade manager is off line, please feel free to leave a message, and tell us the products you need, our model number, and your E-mail address, we will reply to you within 24hours too.